EDS-ISG Data Centre

In 2009 Booth Commercial carried out a £1M contract to supply and install BOOTH-FD fire doors in the UK’s first low energy data centre.

''The 90M project was built for Electronic Data Systems, owned by Hewlett Packard. It creates a 300,000 sq ft, state of the art data facility at Wynyard, Stockton-on-Tees.

Booth Commercial was awarded a contract by contractors Interior Service Group PLC (ISG), to supply and install 60 minute and 120 minute coated and stainless steel fire doors with electrical locking and monitoring systems installed by Frontline Security Services who worked closely alongside Booth Commercial at the design and installation stages.

Booth Commercial supplied their new FD fire doors which has been developed and tested in an 18 month programme with their strategic manufacturing partner Teckentrup GmbH in Germany on a fully automated assembly line.

Paul Pompilli, ISG Project Director said: “Booth Commercial has met and exceeded what was expected of them, so much so that we awarded the company trade contractor of the month in July.  I look forward to working with them in the future on further schemes.”

Latest Projects

EDS-ISG Data Centre

In 2009 Booth Commercial carried out a £1M contract to supply and install BOOTH-FD fire doors in the UK’s first low energy data centre....

St Pancras International

Booth was awarded the contract to supply bespoke and commercial steel doors for the landmark Thameslink Box Fit Out development at St Pancras....

Channel Tunnel Rail Link

This £3.5m contract saw Booth manufacture, supply and install 38 purpose-built cross passage and 425 commercial grade fire doors in tunnels along the Channel Tunnel Rail Link between the centre of London and the South Coast....

Dublin Port Tunnel

In 2004/5 Booth Industries was employed to supply a series of purpose built stainless steel cross passage and commercial grade fire doors for the Dublin Port Tunnel, in a contract worth circa....