Fastrack

Our business model revolves around an assembly to order programme from stocks of pre-finished parts which allows us to produce door sets on very short lead times in any conventional structural opening sizes in any BS or RAL colour.

Stocks of over 500 door leaves for fire, acoustic, security and external enveloping applications, plus frame sections, ironmongery and ancillary items are carried and deployed along with:

  • CAD-EXCEL linked drawing programmes
  • Flexible labour arrangements
  • Large stockholdings
  • JIT supply contracts
  • Collection 'within-the-hour' and 'same or next day ' delivery logistics
  • Fastrack order status reports emailed weekly
  • Quotations in 24 hours
  • Drawings in 24-48 hours

fastrack logo

Up to 5 leaf units 5 working days
6-10 leaf units 10 working days
11-15 leaf units 15 working days


..to provide a genuine FASTRACK SERVICE.


Applies to:
- Products tagged with the FASTRACK logo in the Product Certification page
- Openings from 800-2900mm wide and up to 3000mm high (full height leaves)
- Delivery only orders
- Stock ironmongery, or special items that are available within the
  FASTRACK period quoted

NB: 2 leaf units = 2 singles or 1 double

steel fire doors in stock Door manufacturer engineer CAD
 Over 500 door leaves in stock  Drawings for customer approval can be
 produced in 2-3 minutes


Latest Projects

The M25 Bell Common Tunnel Refurbishment

As part of the Bell Common Tunnel refurbishment programme Booth Industries, the UK’s leading designer and manufacturer of high integrity and commercial grade, performance certified steel doors supplied 30 doors for the Bell Common Tunnel refurbishment project on the M25 in Essex....

EDS Wynyard Low Energy Data Centre Project

In June 2008 architects Houseman Henderson, engineers Norman Disney Young and contractors Interior Service Group (ISG) plc were given a challenge to design and build the UK’s first low energy data centre utilizing ‘free air’ cooling....

Booth Industries supply special acoustic doors

Bolton-based Booth Industries was in a race against time to build specialist sound reducing doors for Ireland’s premier theatre before the grand opening night in November 2008....

EDS-ISG Data Centre

In 2009 Booth Commercial carried out a £1M contract to supply and install BOOTH-FD fire doors in the UK’s first low energy data centre....

St Pancras International

Booth was awarded the contract to supply bespoke and commercial steel doors for the landmark Thameslink Box Fit Out development at St Pancras....

Channel Tunnel Rail Link

This £3.5m contract saw Booth manufacture, supply and install 38 purpose-built cross passage and 425 commercial grade fire doors in tunnels along the Channel Tunnel Rail Link between the centre of London and the South Coast....

Dublin Port Tunnel

In 2004/5 Booth Industries was employed to supply a series of purpose built stainless steel cross passage and commercial grade fire doors for the Dublin Port Tunnel, in a contract worth circa....