Contract Control

Booth Industries has significant experience of handling large, complex multi-million pound contracts.

This experience is backed by the resources required to produce comprehensive contract documentation and control:

  • O&M Manuals
  • HAZOP & RAM Studies
  • Quality & Safety Plans
  • Method Statements & Risk Assessments
  • Factory Acceptance & Test Certificates
  • Site Inspection & Test Plans
  • Punch Lists
  • Material Certificates
  • Materials Approvals Register
  • Contract Certification
  • Steelwork calculations
  • Fire, security, acoustic and blast performance certification
  • Etc.

Booth Commercial has full access to this contracting experience and these core business resources.


“Booth Commercial has met and exceeded what was expected of them, so much so that we awarded the company trade contractor of the month in July.  I look forward to working with them in the future on further schemes.”

Paul Pompilli, Project Director ISG, EDS Data Centre, Wynyard

__________________________________________________________________________


“We received all material approval requests promptly, and all installation Method Statements and Risk Assessments were produced on time, and before work started on site.

The manufacture, installation and testing was completed to meet the site programme requirements, and included a significant rescheduling and acceleration of the offsite production process caused by Client changes

All doors have been made and installed to a very high standard and are fully compliant with our specification. The contract control and support from Booth Industries has been excellent throughout, and site co-ordination has been without any clashes. If the opportunity arises to work together again we would have no hesitation in doing so.”

Steve Louder
Project Manager, MI Joint Venture, Dublin Port Tunnel Contract

__________________________________________________________________________


“Booth has been an excellent company to work with. At all times they have performed very professionally and been able to adapt to the changes which have been thrown at them as the contract progressed. A truly ‘can do’ team and one I would have pleasure working with again.”

Peter Hodkin, RLE
Project Manager, TLBFO St Pancras International Station

Latest Projects

EDS-ISG Data Centre

In 2009 Booth Commercial carried out a £1M contract to supply and install BOOTH-FD fire doors in the UK’s first low energy data centre....

St Pancras International

Booth was awarded the contract to supply bespoke and commercial steel doors for the landmark Thameslink Box Fit Out development at St Pancras....

Channel Tunnel Rail Link

This £3.5m contract saw Booth manufacture, supply and install 38 purpose-built cross passage and 425 commercial grade fire doors in tunnels along the Channel Tunnel Rail Link between the centre of London and the South Coast....

Dublin Port Tunnel

In 2004/5 Booth Industries was employed to supply a series of purpose built stainless steel cross passage and commercial grade fire doors for the Dublin Port Tunnel, in a contract worth circa....